Wednesday, January 13, 2021

Pakistan's power transmission company blames human error for blackout

Blackout in Pakistan on Saturday.

Islamabad [Pakistan], January 13: The monstrous force blackout in Pakistan that dove the nation into obscurity on Saturday was set off by human mistake that caused a flawed electrical switch, as per the National Transmission and Dispatch Company (NTDC). 

Refering to NTDC report, SAMAA TV on Tuesday announced that Poor support of transmission hardware brought about the power outage on the interceding evening of January 9 and 10. 

An electrical switch that stumbled had been kept up without the oversight of the National Power Control Center. 

On Saturday night, Karachi, Lahore, Islamabad, Peshawar, Rawalpindi, and different urban areas were dove into murkiness, leaving the majority in stun and frenzy because of the force disappointment. It took the public authority more than 24 hours to reestablish the force supply reestablished in pieces of Pakistan. 

Pakistan's Central Power Generation Company on Sunday suspended seven authorities of Guddu Thermal Power Station because of carelessness during their obligations which caused the force disappointment, revealed Daily Pakistan. 

Islamabad Deputy Commissioner Hamza Shafqaat had tweeted crediting the power outage to the stumbling of the National Transmission and Despatch Company (NTDC) framework. 

Following the power outage, residents took to online media to vent their rage on the circumstance and taunted Prime Minister Imran Khan for his failure to deal with the emergencies Pakistan is experiencing. (ANI)

Other Posts